One line, one website

An automotive-electronics equipment builder runs a six-section corporate site: About, Products & Solutions, Service & Support, News, Careers, and a message form. What it sells is not a machine but twenty-plus automated lines — turning lidar, in-car cameras and ECUs from parts into modules a car plant can run. The buyers are procurement and process engineers at OEMs and Tier 1s: procurement checks delivery and acceptance; the process engineer checks whether you can actually run their step. So the site is organised the way a line is: loading to shipping, one station per section, each with a number and an output. This page walks from ST00 to ST10.

Industry
Automotive electronics · ADAS sensors / ECU / moulding, assembly and test lines
Site type
Corporate site · six top sections · three-level product tree + detail page + service and careers
Delivered
Information architecture · sorting-gate navigation · process dictionary · chain and spec plate · ANDON board · front-end build
Our role
IA, interface design, front-end, image processing and anonymisation
3 levelsProduct tree as a sorter: vehicle domain → part type → line
6 entriesDispensing, pressing, welding, screwing, gasketing, testing — written as dictionary entries
12 stationsA typical line split into twelve stations, each with its duty and its check
2005First machine shipped, read alongside 18+ years and 200+ lines on the board

Line No. ASL-07 · Start here

Scan in first:
which line runs your part

The first screen carries no aerial photo of the plant and no slogan about craftsmanship. It carries a line: the number and destination of one production line on the left, the shop floor on the right. An equipment buyer comes in to do one thing — confirm that their part can become a module here. So the cover issues a job number; it does not wave hello.

Domain
ADASdriver assistance
Part types
03sensor families
Lines shipped
200+lines

FIG. 01 · Shop floor: assembly and testing share one machine, stations laid out by takt

A horizontal moulding machine in a white shop floor with reflective coating
ST01Output · a product tree you can walk to your part

The sorting gate

The three-level taxonomy is not left inside a dropdown to rot. It is laid out as three rail sections: first by vehicle domain, then by part type, then the actual line. Readers follow the rails; they never step back. The amber path is a sample: ADAS domain → in-car camera → surround-camera automated production segment.

VEHICLE DOMAIN

  • New energy
  • ADAS
  • Thermal management
  • Chassis
  • Car electronics & interior
  • Powertrain
  • Others

PART TYPE

  • Lidar
  • In-car camera
  • Ultrasonic radar
  • Domain controller

LINE

  • Surround-camera automated production segment
  • Front-view module & ECU camera assembly line
  • Front-section ECU automated line
Line close-up: amber pallets and assembly grippers

Gate exit · surround-camera segment
Assembly + dispensing + AA + leak test, end to end

ST02Output · six process entries

The process dictionary

On a marketing site the six support processes would be six identical icon cards. Here they are written as dictionary entries: each process gets a code, a definition, and the lines it appears on. A process engineer can tell from one entry whether this builder actually knows that step — harder evidence than any word like “experienced”.

OP-01

Dispensing

Fixing lens seats and filters, dosed by the milligram. The entry names three adhesive families and the dosing accuracy; it runs on the camera-module segment.

OP-02

Pressing

FPC-to-connector pressing with force and depth logged cycle by cycle. Runs on the front-view module segment and the ECU assembly stations.

OP-03

Welding

Two families: laser welding and hot-rivet forming, for bracket riveting and housing closure on the integrated stations.

OP-04

Screwing

Floating spindles with auto feed; torque curves archived screw by screw. Runs on module segments and the closure stations.

OP-05

Gasketing

Compression control of the seal that decides the leak class. Runs on the sealing station of the front-section ECU line.

OP-06

Testing

Four in-line checks: leak, AOL, AA and FCT. Test data returns to MES; rejects are stopped inside the station.

Shop ceiling trusses and light strips, full width

One process standard, from loading to shipping.

ST03Output · one line, dissected

Line anatomy

The most valuable block on a detail page is not the render; it is this top-view layout drawing: how twelve stations sit, where material enters, where the checks go. Beside it, the process chain spells out what each station does. Buyers lay their own routing against it and can see which stations could be shared.

Top-view layout drawing of an automated line with an exploded detail view

FIG. 02 · Surround-camera segment, top view (drawing anonymised)

What stands on this line

Stations are laid out by takt; assembly and testing share machines; changeover time is written on the plate. Three trade-offs belong on the detail page:

  • Full guarding with safety doors; plasma and camera checks run inside the line, no offline bench;
  • Changeover designed to c60 minutes; same-family products switch without touching the frame;
  • Data links to MES / WPS / WCS; test data returns per unit and rejects stop in-station.
01Pre-lock prep
02Wash & sort
03FCT review
04PLASMA dispense check
05Assembly
06AA
07Hot-rivet forming
08Inline laser welding
09Bracket forming
10Label forming
11FCT review
12Leak test

Process chain, 12 stations · stations 03 and 11 share the name FCT: one check, run twice

ST04Output · a plate hung beside the line

The spec plate

Specs are usually two columns of grey text. Here they are hung as a nameplate on the line: rivets, a serial number, an acceptance field; parameters grouped by capacity, precision, test and check. When buyers copy numbers into an RFQ, they copy them off the plate.

PLATE ASL-07-C Surround-camera segment · as-shipped parameters Accepted
Capacity
100 pcs/hon a two-shift basis
Laser power
30W (optical) window 1.0–1.8mm, s10 assemblyshared source across the welding family
Part size
25×25mm–25×25mm bracket locatedsame-family compatible
Changeover
Automatic fast changeover, whole-line c60minframe untouched
Pressure test
Positive and negative (2001Pa) plus positive (range 70kPa), two-stagesealing station
AOL check
Inner short, distance, barcode, HTL checksdata returns to MES
AA check
APPICC AA with AA gauge, 2000L, ZINO checks; environmental simulation covers EOL, POS, LTGLoptical station
FSV spec
FSV: H > 150°, V > 140°/H > 195°, V > 160°sampled at shipping
ST05Output · a shop-floor board

The ANDON board

“Founded 2005”, “18+ years”, “200+ lines” are usually three big numbers on white. This board sets them the way the board at the gate does: black, amber digits, status lamps, one caption per cell. The numbers are not honours; they are running status.

2005

First machine shippedin production for 21 years

18+

Years delivering linesacross three vehicle platforms

200+

Lines in service46 currently being built

12

Stations on the sample linetakt 36s · first-pass yield 99.2%

ST06Output · acceptance gates and the certificate register

Quality gates

In this industry certificates are not a trophy wall; they are admission tickets. The design showed three certificate images, but images carry company names and numbers, so the page reads them as register cards: name, scope, status. Above them, acceptance written as gates — FAT and SAT, each with conditions you can verify by eye.

FAT · factory acceptance

The buyer comes in and runs the plate, item by item: takt, changeover time, two-stage leak, AA sampling. Signed off, the line is released.

SAT · site acceptance

The line re-runs 72 hours in the buyer’s hall; at target yield it moves to pre-acceptance, final sign-off after three months.

SP · in-process checks

Four check stations across twelve; data archived per unit; rejects stopped in-station and never passed on.

Quality management system Scope · line design and integration Status · valid
High-tech enterprise Scope · smart equipment and vision inspection Status · valid
Invention patents Scope · AA focusing and leak-test processes Status · partly pending
ST07Output · the shift log

The shift log

The news section reads like a shift log: image left, text right, date first, one-line summary. Headlines state facts — a base opening, a line passing SAT, a remote changeover — not celebrations. What a buyer wants to know is whether the builder is moving; the log is the proof.

Exhibition stand with a line exhibit and reception area

2022.12.21

“Ready-before-orders” — second precision base opens

From taking orders to being ready before them: capacity placed half a vehicle cycle ahead. Ground broken in July, two assembly-and-test lines running by December.

Line floor: assembly station with inspection cameras

2022.11.08

Surround-camera segment passes customer SAT

72-hour re-run at 99.2% first-pass yield and a 36-second takt, eight percent inside contract. Pre-acceptance minutes signed.

Line floor: white control cabinet with warning labels

2022.09.30

ECU line completes first remote changeover

Two same-family products switched in 54 minutes without stopping the line. Parameters written back to MES as a standard work order.

ST08Output · a maintenance plan

The maintenance plan

Service & Support is laid out as a plan: response levels in hours, spares as a list, training as sessions. What the buyer is pricing is five-year cost of ownership — this section is where that gets calculated.

Response Remote response within 4 working hours, engineer on site within 48; line-down faults billed hourly with a cap.
Spares Two shifts of consumables ship with the line; critical spares held in regional stock, reachable within 48 hours.
Service Quarterly inspection, one annual overhaul; every service item signed off and archived.
Training Two courses, operation and maintenance, two weeks alongside the line; a work card on passing.
PDFLine technical manual (parameters and electrical drawing index)2023.03
XLSAnnual maintenance plan (editable template)2023.03
DOCFAT / SAT acceptance checklist2023.03
ST09Output · the crew gap list

Crew hiring

Careers stays plain: openings as cards, location, requirements and contract type on one line, an apply button on the right. The apply dialog is shown as a static mock — name, phone and CV, three fields a visitor understands at a glance.

Electrical engineer

Suzhou · plant · full-time

  • Line electrical drawings and PLC commissioning
  • Station joint debugging and takt optimisation with process
Apply →

Mechanical fitter

Kunshan · plant · full-time

  • Line mechanical assembly and precision alignment
  • Work to the assembly sheet, log torque data
Apply →

Commissioning engineer

Wujiang · customer site · full-time

  • Line debugging through the customer’s SAT stage
  • Close out changeover and takt issues, write the report
Apply →

APPLY WINDOW · MOCK

Name
Phone
CV file

The live site uses a dialog form: three fields, submissions queue for HR screening. This is a static mock with no input fields.

ST10Output · a packing list

Shipping out

The contact page is set as a packing list: the visitor fills their own project into the consignee fields, and sales takes it from there. Contact details are anonymised as placeholders.

PACKING LIST · LINE ASL-07

Consignee
Your procurement and process teamplease name the part and target takt
Enclosed
Draft proposal · budget range · reference-line listreply within three working days
Shipment
Suzhou · line shipped in sectionson-site installation guidance
Phone
+86 512-xxxx xxxxworking days 8:30–17:30
Email
sales@example.comquotes and technical both enter here
Address
An industrial park in Wuzhong District, Suzhouvisits by appointment

The last thing off the line is trust

Conversion on an equipment site does not happen at the form; it happens after the process team has read the chain and the plate. So this section stays restrained: one list, six fields, no badge wall, no restated selling points.

FAQ

Four questions we get about sites like this

Why organise an equipment site around lines instead of models?

Because the buyer is not buying the machine; they are buying the line the machine belongs to. The purchase list reads “surround-camera assembly and test line”, not a model number. Sorted by model, twenty lines are twenty spec cards nobody remembers; organised by line, process, takt and acceptance are told once, and readers can still find their own part.

How do you keep a three-level taxonomy from confusing people?

Treat the dropdown as a sorting gate. Level one answers “which domain does your part belong to”; level two, “which kind of sensor is it”; level three names the line. Each level answers one question, each gets a rail, and the reader follows the rail without stepping back.

How does a website prove process capability you cannot see?

With three things: a dictionary, a chain and a plate. The dictionary writes dispensing, pressing and welding as entries; the chain splits a line into twelve stations, each with its duty and check; the plate lists takt, precision and test pressure. The certificate wall is for outsiders; these three are for the review committee.

Can this structure transfer to other equipment builders?

Yes, as long as what they sell is a process rather than a part. The tree can become moulding, stamping, SMT or packaging lines; the dictionary becomes their own process library; the chain runs as many stations as the real line has; the board reads founding year, lines delivered and work in hand. The judgement does not move: ask what the buyer will accept you on, and put that where they see it first.

MORE CASES

More Related Cases

Brand official website · Smart electric vehicle
Brand WebsiteSmart manufacturing, smart cars

Brand official website · Smart electric vehicle

The client is a smart EV company listed on an overseas exchange, headquartered in the Middle East, w...

View Details →
Brand website · one enquiry, one sheet
Brand WebsiteIndustrial Automation

Brand website · one enquiry, one sheet

A website for an authorised industrial-automation distributor: eight product categories of drives, s...

View Details →
Brand website · one line, one website
Brand WebsiteNon-standard automation

Brand website · one line, one website

An automotive-electronics equipment builder runs a six-section corporate site: About, Products &...

View Details →

View All Cases →

Planning a similar production line or enterprise system?

Start with our pricing logic, then let's talk requirements — cost structure, technology comparison and acceptance criteria, all laid out in the open.