Industrial warehouse management for a plastics compounder
In a plastics plant the hard question is not how much is in stock but why it changed. The same bag o...
View Details →Why The Books Drift
Warehouse errors are seldom miscounts — a miscount can be recounted on the spot. What actually hurts is one thing with three names in three places, one action that moves four stock lines, and leftovers nobody knows whether to book back in. Spreadsheets cannot hold any of the three: they record how much, never why.
Purchasing orders by grade (ABS ZA0210, Cabot PE2718), the floor draws by colour (black, white, natural), the customer accepts by material name. One material is one row here, aliases live in the note field — you look up the alias, not your memory.
PC/ABS 4/21 blend: two bags of PC plus one of ABS become a new lot, so stock goes down three lines and up one. The source batches stay on file, or nobody can tell which bag caused a defect.
Issue 500 kg, use 320: does the 180 go back to stock, under which batch, at whose cost? Leave it out and the next stocktake shows a loss; book it to the wrong batch and the books have it while the shelf does not.
So the first job is not arithmetic, it is giving every change of quantity a provenance: who raised the document, which document it came from, which batch it moved. With those three, the books can be audited.
One Map
Modules are split by who uses them; pages are split by one job each. Sales three, purchasing two, stock six, quality two, production four, administration four — no page exists to fill in a form, each one matches a move on the floor.
Customers import from a template, 57 in one go; dispatch notes issue or return against a number; orders keep only number and due date.
Suppliers mirror customers and import the same way; one purchase order carries three sections: purchase, arrival, payment plan.
Six pages and the whole daily round: what arrived, where it sits, what got blended, when it was counted, where it went.
Items form a dictionary (physical test, standard, unit); reports hang off the article number and expire on a 30-day reminder.
Plans carry quantity and due date, issue notes record both dispatch and receipt, and the defect list is the floor's own vocabulary.
Departments carry a code prefix ([cgb] purchasing), roles decide which pages open, and there is exactly one parameter: reminder days.
Read the top menu and you have read the chain: samples → warehouses → stock → test items → test reports → material issues → production plans → defects → machines → users → roles → departments → parameters. The menu is not a feature list, it is the order of work.
Seven Documents
From the supplier's truck to the customer's truck, a batch passes through seven documents. Each does one thing and hands the quantity to the next — the documents record who, when and how much; stock is only their sum.
The Identity
A stocktake is a check, not a source. What actually sets the number is every addition and subtraction during the year. Take the most ordinary material on the shelf: ABS black, raw store, opening 4,260 kg.
Those four numbers come from four sources: the stock row, an RK-CG receipt, a CK-LL issue, a blend note. If a line does not reconcile, the fault is in a document, never in the addition — which is exactly why the books are built as arithmetic instead of a stocktake.
The Floor
The stock page is the first screen a storekeeper opens: 517 rows with raw and finished stores alternating in one table — one screen for two kinds of store, told apart by the warehouse column. Filters cover material, fuzzy material, customer/supplier, specification and colour, because nobody looks a bag up by code; they look it up as “the black one, from Jiangsu Hengda, ZA0210”.
In And Out
Goods receipts and issue notes look almost identical: number, status, detail, pending quantity, booked quantity, warehouse, created time. Two quantities per line is the cheapest idea in the system — goods arrive and go down as pending, they are checked and put away and only then become booked. Nobody has to invent a number in between, and nobody is pushed into confirming early.
| Prefix | Where it comes from | Stock movement |
|---|---|---|
| RK-CG | Purchase order arrives, storekeeper inspects and books in | Raw store + |
| BC-SC | Production plan completed, finished goods booked in | Finished store + |
| CK-LL | Material issue dispatched, signed for on the floor | Raw store − |
| CK-FH | Dispatch note issued against a sales order | Finished store − |
Blending
This is the step software most often loses in plastics. Several bags are combined in proportion into one new lot, and the ingredient table is the recipe: material, batch, quantity. On submit stock gains one new batch and the ingredients are deducted by quantity — from named batches, not from the total.
Blending cannot be undone: a wrong blend is downgraded or scrapped. So three things get checked before submit — batch, quantity, colour — and the system puts all three on one screen for exactly that pause.
Release
Test items are a dictionary, test reports are the evidence. The dictionary fixes what is measured, to which standard and in which unit; the report only carries results — keep them apart and a revised standard never rewrites history.
Thirty days is not a rule, it is this customer's report validity. It is a parameter because a different customer or a different material means a different number. Rules hard-coded into software end up being described as “the system does not fit us”.
The Handover
The issue note is the one document here that needs two signatures: the top half is the store dispatching, the bottom half is the floor receiving. Dispatch 500, receive 480, and the 20 kg gap is settled on the spot — spilled on the way, a weighing error, or left beside the machine for next time.
Those eight are the floor's words, not standard terminology — a defect list has to speak the same language as the floor or nobody fills it in. With the machine number on the issue note, the same defect grouped by machine separates a mould problem from a material problem at a glance.
Thirty Screens
The system ships with 30 screens: 10 lists, 12 entry dialogs, 8 configuration pages. Twelve of them are here — the sales, purchasing, quality and administration pages that case studies usually skip.












Seven of the twelve are dialogs. Half the craft in a back office lives in the dialogs: field order, what is mandatory, dropdown versus typing decide how often the person entering data swears. A handsome list page is useless if the dialog is what opens all day.
Who Can Change What
The user table holds who, the role table holds which pages open, the department table holds whose costs these are. Departments carry a code prefix in the user list ([cwb] finance, [cgb] purchasing, [hqb] logistics) — the prefix is not decoration, it is how reports are cut by department.
| Role | Sales | Purchasing | Stock | Quality | Production | Admin |
|---|---|---|---|---|---|---|
| Administrator | ● | ● | ● | ● | ● | ● |
| Purchasing | ○ | ● | ○ | ○ | — | — |
| Storekeeper | ○ | ○ | ● | ○ | ○ | — |
| Production | — | — | ○ | — | ● | — |
| Lab | — | — | ○ | ● | ○ | — |
| Finance | ○ | ○ | ○ | — | — | — |
Example: ● edit ○ read only — not in the menu. The real table follows the customer's organisation — no two plants are split the same way. There is no standard answer, only the answer to “who can wreck the books”.
Go-Live Order
How fast this goes live has almost nothing to do with the feature list and everything to do with who touches the first number. Same six modules: build accounts before warehouses and permissions lead nowhere; blend before receipts and the ingredient table has nothing to pick.
Warehouse types (raw, finished) → materials (raw, finished, samples) → customers and suppliers by template. Until this is done, no document below can be filled in.
Purchase order → receipt (pending to booked) → the row appears in stock. Teaching the storekeeper to book on arrival beats any training session.
Production plan → material issue (dispatch and receipt) → finished receipt → test report. Once the floor is in, the books have two sides to reconcile.
Test items and report templates, roles and accounts, the 30-day reminder. Permissions last — they only mean something once there is data to protect.
MORE CASES
In a plastics plant the hard question is not how much is in stock but why it changed. The same bag o...
View Details →An overhead crane is a made-to-order machine: span, capacity, lift height and colour all follow the ...
View Details →On the same job, sales signs in square metres, purchasing buys in tonnes, the shop floor moves piece...
View Details →Start with our pricing logic, then let's talk requirements — cost structure, technology comparison and acceptance criteria, all laid out in the open.