Smart sand & aggregate pit-site management platform
A B/S on-site management platform for sand pits: login, visual dashboard, card top-up, dredger manag...
View Details →Sand extraction affects river-channel stability, flood safety, navigation and the ecology of the water body. Extraction in the wrong zone, at the wrong time or in the wrong method can destabilise the channel and endanger flood discharge. Earlier management relied largely on manual patrols and paper records; what happened on site did not reach managers in time.
The decision that shaped the system: the on-site console is not here to keep the office ledger; it turns everything that happens on site into a record carrying a time, a photo and a person responsible. Solid on-site evidence is what makes upper-level summaries, reconciliation and regulatory filing possible.
The specification lists them as menus, but the data follows one main line: login → dashboard view → truck enters and weighs empty → loads → exits and weighs gross → pays and releases → record archived. Break any link and the other end cannot reconcile.
| Module | What it holds | Who uses it |
|---|---|---|
| Login | Accounts created centrally; sign in to the pit-site console, one person one account, menus scoped by role | Site manager, gate guard, weighbridge clerk, lead |
| Visual dashboard | Zone outline map and site map, camera points and live patrol, violation alerts with image and video replay, manual barrier raise at entry / exit / scale, output summary (total, extracted, today’s output, remaining quota) | Manager and site lead; first screen of the day |
| Top-up | Virtual amount loaded onto a card; balance follows the truck and card as the quota for on-site billing and release | Till clerk and finance: top up, check balance, match payments |
| Dredger management | Profiles for all dredgers on the pit, with a live feed from each vessel | Zone management: where the vessel is, whether it is working |
| Vehicle management | Truck profiles (add / remove / maintain), entry track notice, entry photo, tare record (photo + tare value), exit record (photo + gross value), payment record (photo + fee + receipt snapshot) | Gate and weighbridge: match plate, weight and receipt per truck |
| Hardware integration | Dual smart weighbridge with gates, vessel GPS terminal, scale sensors and indicators, camera points with maintained zones, receipt printer, card-paid barrier system | Implementation and ops: online status, accurate readings, commissioning passed |
| Storage & commissioning | Images and video stored locally and uploaded to the central data centre; on-site deployment, software tuning and hardware-software joint testing | Implementation team: go live and keep data retained |
A deliberate choice: vehicle records are kept in four segments — entry, tare, exit, payment — each with a photo. A number without a photo cannot prove which pit a truck left from; four photos together make one haul a complete piece of evidence.
Split the trip into six steps; each does one thing and leaves an original record that cannot be freely edited. The dual scales handle tare and gross separately; readings are captured directly, not reported by hand.
One scale shared by empty and loaded trucks mixes queues and misorders weights. With dual scales at the entry and exit, the route is fixed and tare and gross never cross. Scale platform, sensors and indicator are wired separately, readings captured direct. Manual barrier raise is allowed in exceptions — entry, out-of-scale, exit — but every raise enters the barrier log: who raised it and when is checkable later.
Top-up first writes a virtual amount onto the card; exit billing deducts from that balance. On short balance the barrier stays down, avoiding chasing payment after the fact. The printer outputs a receipt at the payment node; the receipt is also photographed and archived against the same haul record. Billing is moved from month-end reconciliation to the moment of release: quota is checked before the barrier lifts, not discovered overdrawn at month end.
A dashboard is not a pile of numbers; it answers the four questions asked on site most often: where the pit is, who is working, whether cameras are healthy, and whether anything looks off. Outline map, point map, feed patrol and alert list are organised around these four.
No one can watch dozens of feeds all day. Video is used for after-the-fact checking: when a record looks odd, replay that camera point by time and check plate, load and anomaly. Each camera point’s area is maintained in the system so the feed maps to the right place on the outline map. The pit side has view-only rights; camera PTZ and arming stay on the upper platform, so the on-site console does not overreach.
Alerts come from abnormal states of trucks, vessels and devices. Each alert links to the image and video from that moment and can be replayed. It does not replace enforcement judgement, but it turns “we heard a boat at night” into a record with time, point and footage. Device offline also enters the alert list, because an offline device means a broken evidence chain.
The hard part of these projects is usually not the interface but how devices are read reliably and whether data survives a network outage. Hardware integration is centralised in the ingest layer; field device models are isolated so upper business code does not bind to a specific brand.
| Hardware / integration | What it connects | How it lands |
|---|---|---|
| Dual smart weighbridge with gates | Tare and gross two weighings; tare and gross readings stored | Fixed platform route; direct readings; manual raises logged |
| Vessel GPS terminal | Periodic position reporting, track and on-board feed entry | Position and track queryable by vessel, pit, period |
| Scale sensors & indicators | Sensor signal and indicator reading as the source of slip values | Indicator faults and comms timeouts in device health check |
| Video monitoring | Point-zone maintenance, live streaming, patrol and replay | Points map to the outline; site side views only |
| Printer | Slip / receipt output at the payment node | Receipt also photographed and bound to the haul record |
| Card-paid barrier system | Card billing, balance check, barrier release linkage | Short balance blocked first; override release logged as well |
Site networks are not always stable. If images and video lived only in the centre, evidence could be lost during an outage. The system retains images and video locally first, then uploads to the central data centre when the network recovers; both ends keep a copy. The local copy guarantees continuity on site; the central copy handles aggregation, retrieval and upward filing.
The specification splits delivery into three steps: on-site software deployment, software tuning, and hardware-software joint testing. After hardware arrives, whether the scale reads correctly, the card raises the barrier, the video streams and the printer outputs must all be worked through during commissioning — not left for after go-live. Commissioning records, device list and point mapping are handed over together, so later ops have a basis for swaps and additions.
The screenshots below come from the actual pages of the smart sand & aggregate on-site platform, grouped as pit profile → truck and haul records → monitoring and zone layout. Plates, names, phone numbers and receipt amounts are anonymised demo values.
Field systems risk either falling behind soon after launch or being too rigid to use. The eight principles from the specification were applied one by one; each maps to a concrete product trade-off.
After go-live the most direct change is that “the situation on site came back to the dashboard”: which vessel is working, which truck reached which step, whether cameras are healthy and how much quota remains are visible from the console instead of by phone and running around site. Next, evidence is captured up front: each haul’s photos, weights, fee and receipt are bound as it happens, so month-end reconciliation no longer needs paper slips spread on a table; anomalies and violations carry footage to replay, moving management action from after-the-fact patrol to on-site alert. The quieter change: site, billing and management finally speak from the same set of records, and the argument moves from “you wrote it wrong” to “which record do we look at”.
As agreed with the client, no client name, contact details or identifiable permit numbers appear on this page; the on-site screenshots below are de-identified, and quantities and amounts are anonymised examples used only to explain the calculation.
Projects like this — site outdoors, ledger in the office — rarely fail on interface design. They fail on four questions: how the field devices connect, how exceptions leave a trace, how one set of numbers is agreed, and how data survives an outage. Bring your current paperwork to the first call and we will tell you which of the four is your bottleneck, then scope it.
MORE CASES
A B/S on-site management platform for sand pits: login, visual dashboard, card top-up, dredger manag...
View Details →A B/S supervision console for city, county and Yellow River Commission levels: regional one-map view...
View Details →Conference products fail when the feature list becomes a menu wall — registration, agenda, streamin...
View Details →Start with our pricing logic, then let's talk requirements — cost structure, technology comparison and acceptance criteria, all laid out in the open.