One big screen, two camera moves

The Anpai Precision production-data wall is a digital-twin screen hung on the shop floor: a 3D plant as the ground, data panels on the four corners, one click drilling from plant to lines, another click opening production overviews and process parameters. This case follows one patrol route — plant first, lines second, down to a single parameter last — so you finish knowing what zones a production wall needs, where the data goes, and how the drill-down connects.

ANPAI PRECISION · PRODUCTION DATA VISUALIZATION

Plant first, lines second, one parameter last

The failure mode of a factory wall is pinning reports on glass. This screen does the opposite: one 1920×1080 frame answers only "now" — what is moving in the plant, which crew is keeping up with plan, which parameter has crossed its tolerance. Below, the screen is split into six zones, then patrolled at three focal lengths: Z1 → Z2 → Z3.

S1 Production progress S3 Output details S2 Output value S4 Cost analysis S5 3D plant · tap a building to drill Anpai Precision Production Data Visualization 2022-12-06 14:28:37 Progress PLAN/ACT Output value MONTHLY Month total 20M yuan Output details YIELD Full check 90.89% · E369-P90 Cost analysis COST 22% Total 52,154 Power 1000kw·h Water 800t 1 12 16 3D plant scene building blocks · crane motion · badges Auto patrol running Far view Near view Crane 3 · repair S6 Patrol bar · auto patrol / far / near / crane status
1920×1080one frame, one workshop
6 zones4 corner panels + scene + bar
2 drill levelsbuilding → line, popups carry taps
3 status coloursnormal / alert / repair, site-wide
Z1ALT 40M

First camera: the plant as a map, panels on corners

The wall opens on a 3D bird's-eye: every building a blue block, roof badges numbered 1, 12, 16. Four data panels sit on the four corners and the centre stays clear for the scene — let people see the plant first, then read numbers.

Anpai visualization wall: clean 3D plant overview with building badges 1, 12, 16
LIVE · 2022-12-06 14:28:37Plant overview · first sightZOOM 0.6× · ALT 40M
d01 · Clean overview: central scene + corner panels + patrol bar, no popups
Wall overview with all four corner panels open and the output-details popup over the scene
LIVE · 2022-12-06 14:28:37Plant overview · panels fully openZOOM 0.6× · ALT 40M
d02 · Panels open: volume, money, quality, cost — one corner each, popup over the scene

Production progress PROGRESSTop left

Planned and actual output as paired bars per crew (“cable-F crew” and peers) — the crew that falls behind jumps out without hunting row by row.

Output value RUNNINGTop right

Yesterday's scope, in ten-thousand yuan: month total 20M; bars ranked by line so it is obvious which line earns.

Output details OUTPUTBottom left

Crew yield as a full-range line (**** down to 20%), plus a roll call below: “E369-P90 clamp assembly / line F / full check / 29,999 / 90.89%”, full-check rows in their own colour.

Cost analysis COSTBottom right

A 22% / 30% / 20% / 28% build-up plus cards totalling 52,154 for power, water, steam and labour — units written beside the readings: power 1000kw·h, water 800t, steam 800m³.

20Mmonth output value (yuan) · top right
52,154cost total · bottom right
90.89%full-check yield · bottom left
±2°Ctemperature tolerance · see Z3
The corners are not equal weight — top left answers “today's volume”, top right “yesterday's money”, bottom left “each crew's quality”, bottom right “every kilowatt's cost”. Volume, money, quality, cost: exactly the four items of a shop-floor morning meeting.
Z1+TAP · L1

Tap a building, every line shows its colour

Every building in the overview is an entry. The “all lines” popup groups buildings 1, 2 and 16, one status block per line — three colours lay the shop floor out on the screen.

Overview with the all-lines popup over the scene, grouped by buildings 1, 2 and 16
TAP · building entryAll-lines popup · over the overviewZ1+ · drill level 1
d03 · The popup never covers the whole: building blocks and corner panels stay visible
All-lines popup close-up: buildings 1, 2, 16 grouped, line blocks in three status colours
c1 · Close-up: a wall of line blocks grouped by building

How to read this popup

  • 1Grouped by building: 1 / 2 / 16 each forms a section that matches the roof badges — the building you tapped is the one listed.
  • 2Lines as blocks: one coloured block per line, no status text column — a wall of blocks shows the odd colour at a glance.
  • 3Legend pinned top right: normal / alert / repair sits on the popup corner, so newcomers never guess colours.
Normal Alert Repair Three colours are the site-wide status language: overview, popup and bar alike
Only three status colours, used everywhere — roof badges, line blocks and the crane status in the patrol bar share one palette. One colour language means the duty operator never learns a second.
Z2GND

Second camera: down to the line, and let it patrol

Enter a line and the camera reaches the ground: the white building model gives true scale, cranes (bridge cranes) move on their rails in real time. The bar keeps “auto patrol running” — untouched, the screen patrols its own timeline; manually, far and near views switch on demand.

Far view of the 3D line model with the real aerial reference window on the right
LIVE · auto patrolLine far view · whole line in frameZOOM 0.6× · GND
d04 · Far: the full line, with a real aerial window for reference
Near view of the line model: crane rails, patrol bar and crane status window
LIVE · auto patrolLine near view · crane motion readableZOOM 1.4× · GND
d05 · Near: crane position and the bar (play / timeline / far-near) readable
The crane is the most expensive moving asset on a line, so the screen gives it two feeds: one moving inside the 3D model, one real aerial for reference — if model and reality disagree, the model needs updating. Crane 3 carries a red “repair” tag in the same status language as the popups.
Z2+TAP · L2

Tap a line, one table from shift to output

Tap again inside the near view and the “production overview” opens: shift starts at 08:00 on the clock, harness G01 lines up per row, 6,000 units accumulate per row, and every row ends with “view details” that carries you to the next camera.

Production overview popup: shift time 08:00, harness G01, output 6,000, detail entry per row
TAP · line entryProduction overview · through 2022-08-19Z2+ · drill level 2
d06 · Overview: few rows, large type — readable from three metres away
Production overview close-up: four columns of shift time, harness id, output and detail entry
c3 · Close-up: four columns — time / id / quantity / entry

Four column names, four sentences

  • 1Shift time 08:00: on-the-hour starts keep one shift convention, so cross-line comparison stays honest.
  • 2Harness G01: the harness id is the scheduling unit — trace material back to the board.
  • 3Output 6,000: quantities accumulate per row; completion reads off directly.
  • 4View details: every row carries its own entry — a wall table's last column is always “drill further”.
This is the most “spreadsheet” screen on the wall — yet only four column names, taller rows, larger digits. Putting a report on a wall is not pasting Excel; it is keeping only the columns that matter from three metres.
Z3MACRO

Third camera: it all lands on one parameter

“View details” opens the process popup: process time 2h30m, current 2A±0.1, voltage 220V±5, temperature 40°C±2 — with actual duration and sampled current, voltage and temperature aligned row by row beside them. The wall's last layer is not a chart; it is parameters and deviation.

Process popup: spec columns for time, current, voltage, temperature aligned with sampled values
TAP · view detailsProcess popup · 2022/01/01 8:00Z3 · macro
d07 · Process: four spec columns left, four sampled columns right, aligned per row
Process popup close-up: 2h30m, 2A±0.1, 220V±5, 40°C±2 specs beside sampled values
c2 · Close-up: specs carry tolerances; samples sit beside them

What writing tolerances onto a wall means

  • 1Specs as headers: 2h30m / 2A±0.1 / 220V±5 / 40°C±2 are the column names themselves — no side document needed.
  • 2Samples beside specs: actual duration and sampled current, voltage, temperature align on the same row — deviation is exposed by position, not by paging.
  • 3Out of range, seen now: ±0.1A and ±2°C tolerances mean a crossed sample must be visible at once — the line between a production wall and a showcase wall.
A wall is not reports on glass; it is deviation pushed into the operator's face. The first three cameras cover “seeing wide”; this one covers “seeing sharp” — a patrol should end with your eyes on one parameter.
Z3+ICON

Every icon on the screen is a reading

The numbered roof badges (1, 12, 16) are clickable too. Tapping one opens output details by “date / shift / line / planned / actual” while the value and cost panels hold their corners — however deep you drill, the panels never leave.

Output-details table from a roof badge tap: date, shift, line, planned and actual output, corner panels still visible
TAP · roof badgeOutput details · corner panels stayZ3+ · metric layer
d08 · Icon popup: the table takes the centre only; not one corner panel withdraws

Three rules for badges

  • 1A badge is an entry: the building number is not a label but a tap target for that building's output details — entry density decides whether a wall is watched or used.
  • 2Popups never cover the whole: the details table takes one central block; the overview and all four panels remain — no matter how deep, no one gets lost.
  • 3Planned and actual share one table: the two columns pair exactly like the top-left bars — the numbers reconcile.
SUMLEDGER

The read, written down

Six zones, two drill levels, three status colours — collapsed into one reading ledger that doubles as this wall's acceptance checklist.

ZoneKey readingWhat it answers
S1 Progress · top leftplan vs actual paired barsIs every crew keeping up today
S2 Value · top rightmonth total 20M yuanHow much was earned this month
S3 Output · bottom leftfull check 90.89% · 29,999Where quality and output stand
S4 Cost · bottom righttotal 52,154 · power 1000kw·hWhere the money goes
S5 3D plant · centrebuildings 1/12/16 · crane motionWhat is moving in the plant now
S6 Patrol bar · bottomauto patrol / far / nearThe screen stays alive unattended
S7 Overview popup08:00 / G01 / 6,000What one line scheduled today
S8 Process popup2A±0.1 / 220V±5 / 40°C±2Has any parameter crossed tolerance
Total8 zones · 2 drill levels · 3 coloursOne wall = one morning meeting
PKGDELIVER

The specimen accounts

Deliverables are filed by camera level: full frames for layout, popup close-ups for fields. Two accounts, each audited on its own.

AccountContentsCount
Full framesclean overview / panels open / all-lines popup / line far / line near / production overview / process / icon metrics8
Close-upsall lines (c1) / production overview (c3) / process (c2)3
Total1920×1080 originals compressed to 1280 wide · close-ups cropped at native size11
Why specimens file by camera: layout review reads the full-frame account, field review reads the close-up account — “wrong zones” and “wrong fields” never blur into one problem.

FAQ

Why tell a wall's story with cameras?

A wall's information is naturally layered: plant, line, parameter. The patrol route is the usage route — operators start on the overview, drill from building to line, and stop on a process parameter. The case is told in that order, and acceptance follows the same order.

Where is the line between a wall and the reporting system?

The wall answers “now”: status, deviation, motion. Reports answer “the past”: ledgers, summaries, traceability. The ± tolerances in the process popup are the wall's bottom line — a crossed sample must be seen at once, not discovered at month-end reconciliation.

Does the 3D scene need detailed modelling?

The central scene is a “map”, not decoration. Building blocks, crane motion and numbered badges are enough; modelling precision follows the question — only moving assets like cranes deserve per-unit models, static buildings stop at block level, with one real aerial feed for reference.

How are the corner-panel metrics chosen?

Volume, money, quality and cost take one corner each: production progress, output value, output details and cost analysis each govern one matter. One chart plus one roll call per corner — more crowds, fewer starves; align the scope with the shop-floor morning meeting and the wall gets watched every day.

MORE CASES

More Related Cases

Smart medicine box · one box, three watch posts
Smart Factory IoTSmart healthcare, intelligent medicine box

Smart medicine box · one box, three watch posts

A smart medicine box is not just a box that went online — it is one box at home, a batch of boxes a...

View Details →
Smart Home APP Control System · One Air Conditioner, Six Airflow Channels
Smart Factory IoTsmart home

Smart Home APP Control System · One Air Conditioner, Six Airflow Channels

This proposal takes air as the app's main narrative: the stream enters at the grille, passes through...

View Details →
Production data wall · one screen, two cameras
Smart Factory IoTIntelligent manufacturing, intelligent workshop

Production data wall · one screen, two cameras

The Anpai Precision production-data wall is a digital-twin screen hung on the shop floor: a 3D plant...

View Details →

View All Cases →

Planning a similar production line or enterprise system?

Start with our pricing logic, then let's talk requirements — cost structure, technology comparison and acceptance criteria, all laid out in the open.